KHLŌROS ENERGY

Nopal biorefinery simulator

Change the feed, the biomass characterization, the process conditions and the plant configuration, and see what plant the ISBL and OSBL lines of the USD 8.0 M raise can build and what it produces.

Illustrative conceptual model for discussion. Installed costs are AACE Class 5 estimates (−30% to +50%). Process values come from published literature and stated assumptions, not from measurements on Khlōros feedstock. Nothing here is a forecast, a valuation or an offer of securities.

Conceptual model v1 · October 2026
Configuration

Process at a glance

Each block shows its stream at the current settings, per day. Dimmed blocks are switched off.

What the budget builds

Installed cost by block

At the current scale, mapped to the use-of-funds line it is paid from.

Alternatives at the largest size each one can afford

Every configuration below is sized to the same budget, with your current biomass and horse count. Select a row to load it.

Basis and sources

Origin codes: L published literature, A assumption, F company figure. Installed costs are engineering estimates built from the cost data cited beside each block. Not yet reviewed by an independent engineer.